100+ Time and Work Problems with Solutions for Bank Exams - 2
Question: 6
Amit and Sumit can plough a field in 4 days. Sumit alone can plough the field in 6 days. In how many day’s will Amit alone plough the field?
(A) 10 days
(B) 11 days
(C) 12 days
(D) 14 days
Ans: C
Amit’s 1 day’s work = $$({1}/ {4} – {1}/ {6})$$ = $${1} / {12}$$.
∴ Amit alone can plough the field in 12 days.
Question: 7
A can complete a certain work in 4 minutes, B in 5 minutes, C in 6 minutes, D in 10 minutes and E in 12 minutes. The average number of units of work completed by them per minute will be
(A) 0.40
(B) 0.16
(C) 0.80
(D) 1.20
Ans: B
Required average = $$({1}/{4} + {1}/{5} + {1}/{6} + {1}/{10} + {1}/{12}) / 5$$ = $$({48} / {60} × {1} / {5})$$ = $${4} / {25}$$ = 0.16.
Question: 8
A man can do a job in 15 days. His father takes 20 days and his son finishes it in 25 days. How long will they take to complete the job if they all work together?
(A) Exactly 6 days
(B) Less than 6 days
(C) More than 10 days
(D) Approximately 6.4 days
Ans: D
1 day’s work of the three persons = $$({1}/{15} + {1}/{20} + {1}/{25})$$ = $$47/300$$.
So, all the three together will complete the work in $$300 / 47$$ = 6.4 days.
Question: 9
A conveyor belt delivers babbage at the rate of 3 tons in 5 minutes and a second conveyor belt delivers babbage at the rate of 1 ton in 2 minutes. How much time will it take to get 33 tons of babbage delivered using both the conveyor belts together?
(A) 25 min
(B) 25 min 30 sec
(C) 30 min
(D) 40 min
Ans: C
Babbage delivered by first belt in 1 min = $$({3} / {5})$$tons.
Babbage delivered by second belt in 1 min = $$({1} / {2})$$ton.
Babbage delivered by both belts in 1 min = $$({3} / {5} + {1} / {2})$$ton = $${11} / {10}$$tons.
∴ Required time = (33 ÷ $${11} / {10})$$min = $${33 × 10} /{11}$$min = 30 min.
Question: 10
The daily wages of a worker are Rs. 100. Five workers can do a work in 10 days. If you pay Rs. 20 more daily, they agree to do 25% more work daily. If the proposal is accepted, then the total amount that could be saved is
(A) Rs. 100
(B) Rs. 200
(C) Rs. 300
(D) Rs. 600
Ans: B
5 worker’s 1 day’s work = $${1}/{10}$$.
5 workers 1 days work on increasing wages
= 125% of $${1}/{10}$$ = $$({125} / {100} × {1} / {10})$$ = $${1} / {8}$$.
So, now the work is done in 8 days.
Original wage bill = Rs. (100 × 5 × 10) = Rs. 5000.
New wage bill = Rs. (120 × 5 × 8) = Rs. 4800.
∴ Amount saved = Rs. (5000 - 4800) = Rs. 200.
DC Generator Questions and Answers Pdf More
Electromagnetic Induction Quiz Questions and Answers More
Basic Electronics Quiz Questions with Answers Pdf More
Wireless Communication MCQ Questions with Answers More
Digital Communication Quiz Questions and Answers Pdf More
Computer Awareness for GATE, SSC, UPSC, Banking, Railway Questions More
Compiler Design Objective Questions and Answers More
GATE Chemical Engineering Study Materials, Notes 2024-2025 More
7000+ Environmental Pollution MCQ Questions and Answers Pdf More
World Panorama Questions and Answers Pdf More