1000+ Bridge Engineering Objective Type Questions & Answers - 1
Question: 1
In preliminary survey cross sections at _____ interval should be determined.
(A) 20 m
(B) 30 m
(C) 40 m
(D) 50 m
Ans: D
50 m
Question: 2
Which one of the following is not a type of culvert?
(A) slab culvert
(B) through culvert
(C) pipe culvert
(D) box culvert
Ans: B
through culvert
Question: 3
If a rocker and roller bearing is provided at one end of a bridge girder; then the other end will be
(A) free end
(B) rocker bearing
(C) simple support
(D) fixed end
Ans: B
rocker bearing
Question: 4
The cross section of a pier may be
(A) with triangular edges towards upstream and downstream sides
(B) with curved faces on upstream and downstream sides
(C) rectangular
(D) all the above
Ans: D
all the above
Question: 5
Which one of the following is not the correct statement? Bridge site
(A) be geologically sound
(B) be narrow
(C) up at reasonable proximity to the direct alignment of road
(D) should not possess high banks
Ans: D
should not possess high banks
DC Generator Questions and Answers Pdf More
Electromagnetic Induction Quiz Questions and Answers More
Basic Electronics Quiz Questions with Answers Pdf More
Wireless Communication MCQ Questions with Answers More
Digital Communication Quiz Questions and Answers Pdf More
Top 25+ Indian Air force Gk Quiz Questions and Answers More
6999+ Geography Questions asked in SSC CHSL Pdf More
Top 100+ Prepositions Worksheets with Answers More
Java Collections Programming Interview Questions Answers More
100+ Letter Analogy Questions and Answers More