1000+ Petroleum Engineering Interview Questions and Answers Pdf - 1

Question: 1

What type of log could be ran to determine if the primary cementing job was leaking?

(A) sp log

(B) neutron porosity

(C) cement bond log

(D) gamma ray

Ans; C

cement bond log

Question: 2

Which of the following statements is incorrect about blind rams?

(A) they can stop the flow from the well if used when the drill string is in the table

(B) they are designed to close when no pipes is in the hole

(C) they flatten drill pipe if accidentally used

(D) a and b

Ans: A

they can stop the flow from the well if used when the drill string is in the table

Question: 3

BOP consists of

(A) Blind RAM

(B) Pipe Ram

(C) Shear RAM

(D) All of the above

Ans: D

All of the above

Question: 4

Hydrocyclones cannot be used alone with weighted mud systems because

(A) their operating cost is very high

(B) they are not effective in removing coarse particles

(C) they are very expensive

(D) their cut off point falls in the particle size range of barite

Ans: D

their cut off point falls in the particle size range of barite

Question: 5

Which of the following bits are recommended for drilling hard formations in the deep section of the well?

(A) diamond bit

(B) pdc bit

(C) roller bit with mill tooth

(D) roller bit with tungsten carbide insert

Ans: A

diamond bit

Related Questions
Read More Engineering Topics