1000+ Gate Petroleum Engineering Mock Test - 1

Question: 1

Which of the following method is used for cargo carrier loading?

(A) bottom loading

(B) splash loading

(C) submerged loading

(D) all of these

Ans: D

all of these

Question: 2

The gap analysis is

(A) it is an assessment between a current situation and a future, desired goal

(B) an assessment of the difference between requirements and the ability to meet those requirements

(C) both a and b

(D) none of the above

Ans: C

both a and b

Question: 3

Two dimensional slice from the surface of the earth downward is known as

(A) basin section

(B) seismic section

(C) geological section

(D) none of the above

Ans: B

seismic section

Question: 4

The formation of horizontal or nearly horizontal layers of bed at the time of deposition, in which the coarsest particles are concentrated at the bottom and grade gradually upward into fine silt is known as

(A) graded bedding

(B) cross bedding

(C) both a and b

(D) none of the above

Ans: A

graded bedding

Question: 5

The initial stage of kerogen alteration is termed as

(A) diagenesis

(B) metagenesis

(C) catagenesis

(D) none of the above

Ans: A

diagenesis