1000+ Gate Petroleum Engineering Mock Test - 1
Question: 1
Which of the following method is used for cargo carrier loading?
(A) bottom loading
(B) splash loading
(C) submerged loading
(D) all of these
Ans: D
all of these
Question: 2
The gap analysis is
(A) it is an assessment between a current situation and a future, desired goal
(B) an assessment of the difference between requirements and the ability to meet those requirements
(C) both a and b
(D) none of the above
Ans: C
both a and b
Question: 3
Two dimensional slice from the surface of the earth downward is known as
(A) basin section
(B) seismic section
(C) geological section
(D) none of the above
Ans: B
seismic section
Question: 4
The formation of horizontal or nearly horizontal layers of bed at the time of deposition, in which the coarsest particles are concentrated at the bottom and grade gradually upward into fine silt is known as
(A) graded bedding
(B) cross bedding
(C) both a and b
(D) none of the above
Ans: A
graded bedding
Question: 5
The initial stage of kerogen alteration is termed as
(A) diagenesis
(B) metagenesis
(C) catagenesis
(D) none of the above
Ans: A
diagenesis
GATE Chemical Engineering Questions and Answers More
GATE 2024-2025 Question Paper Pdf Download More
Banking Awareness Questions 2024-2025 More
Computer Quiz Questions for Bank Exams More
Computer Quiz Questions for Bank Exams More
Digital Image Processing Quiz Questions & Answers More
Biodiversity Multiple Choice Questions & Answers for TNPSC, NEET More
Top 20+ C# Windows Service Interview Questions and Answers More
7000+ Prefixes and Suffixes Exercises Pdf More
100+ Boats and Streams Questions for IBPS, SBI PO, SO, Clerk More