1000+ Tunnelling Civil Engineering Questions and Answers - 2
Question: 6
For full face method, the excavation to be done generally divided into
(A) two sections
(B) three sections
(C) four sections
(D) five sections
Ans: B
three sections
Question: 7
Concrete lining is provided concurrently with the driving operation in case of
(A) soft rock
(B) rock terrain
(C) running soil
(D) none of these
Ans: B
rock terrain
Question: 8
Which one of the following methods is adopted permanent drainage of tunnels
(A) provision of longitudinal drains
(B) grouting with cement or chemicals
(C) continuous open drains
(D) concrete lining
(E) all the above
Ans: E
all the above
Question: 9
For B.G. single track railway, the height of the tunnel above top of rails should be
(A) 5.5 m to 5.8 m
(B) 5.8 m to 6.2 m
(C) 6.7 m to 7.3 m
(D) 7.3 m to 7.5 m
Ans: C
6.7 m to 7.3 m
Question: 10
If āNā is the number of shafts used, then the total number of faces available for attacking the excavation and construction in tunnels are
(A) 2 N
(B) N + 2
(C) 2 N + 1
(D) 2 N + 2
Ans: D
2 N + 2
- 100+ Tunnelling Civil Engineering MCQ Questions and Answers Pdf
- 1000+ Tunnel Engineering Objective Type Questions and Answers
- 1000+ Tunnel Engineering Multiple Choice Questions and Answers
- 1000+ Tunnelling Civil Engineering Questions and Answers
- 1000+ Tunnel Engineering MCQ Questions and Answers
- 1000+ Civil Engineering Questions and Answers Pdf
Signals and Systems MCQ Questions and Answers Pdf More
Electrical Power Sources Quiz Questions & Answers Pdf More
Electromagnetic Field Theory Question Bank 2024-2025 More
Power Semiconductor Device and Integrated Circuits Questions More
Strength of Materials Questions and Answers Pdf More
1000+ UPSC English Question Paper with Answer Pdf More
TNPSC Heat, Light, Sound MCQS Questions | Study Notes More
Top 1000+ Indian Railway MCQ Questions & Answers More
Top 100+ Android Multimedia Interview Questions and Answers More
Short Reading Comprehension Passages for Beginners More