1000+ Power Generation Objective Questions and Answers Pdf - 1
Question: 1
During load shedding
(A) system frequency is reduced
(B) system voltage is reduced
(C) some loads are switched off
(D) system power factor is changed
Ans: C
some loads are switched off
Question: 2
Which of the following power plants need the least period for installation?
(A) hydro-electric power plant
(B) nuclear power plant
(C) diesel power plant
(D) thermal power plant
Ans: C
diesel power plant
Question: 3
For a consumer the most economical power factor is generally
(A) 0.5 lagging
(B) 0.5 leading
(C) 0.95 leading
(D) 0.95 lagging
Ans: D
0.95 lagging
Question: 4
A power transformer is usually rated in
(A) kW
(B) kVAR
(C) kWh
(D) kVA
Ans: D
kVA
Question: 5
An over excited synchronous motor on no laod is known as
(A) alternator
(B) induction motor
(C) generator
(D) synchronous condenser
Ans: D
synchronous condenser
Signals and Systems MCQ Questions and Answers Pdf More
Electrical Power Sources Quiz Questions & Answers Pdf More
Electromagnetic Field Theory Question Bank 2024-2025 More
Power Semiconductor Device and Integrated Circuits Questions More
Strength of Materials Questions and Answers Pdf More
Top 50+ System CPU Performance MCQs Quiz Questions & Answers More
NIB International Bank Exam Questions and Answers Pdf More
Sports Cups and Trophies List Pdf More
Top 50+ Reproductive System MCQ Questions with Answers More
1000+ Computer Basic Questions and Answers More